Commercial Solar EPC
Commercial Solar EPC Contractor for the Southeast
One contract, one accountable party: engineering, procurement, construction, interconnection and commissioning for commercial solar arrays from 100 kW to multi-megawatt.
Commercial solar EPC since 2001 · Disabled veteran-owned · 7.8+ MW installed

Commercial solar EPC since 2001
Solar, three-phase hybrid battery storage and micro-grids for businesses that measure power in megawatts. Our largest single system: 1.267 MW of rooftop solar and 55,000 lb of battery storage for Samsonite and TUMI in Vidalia, Georgia.
Or call 770-490-2585 and speak to Doug directly.









What we do
Commercial Solar EPC
One contract, one accountable party: engineering, procurement, construction, interconnection and commissioning for commercial solar arrays from 100 kW to multi-megawatt.
Battery Storage
Three-phase hybrid battery systems sized from your interval data, built to hold down demand charges and keep critical loads running when the grid does not.
Micro-Grids
Islandable solar and battery micro-grids that separate the loads you cannot lose from the ones you can, and carry them through an outage without a fuel delivery.
Power Factor Correction
The cheapest fix on most commercial power bills. Correcting a poor power factor removes the utility penalty and often pays back faster than solar, so it should usually be done first.
Our own product
Our own branded outdoor battery cabinets, built around CATL cells. 55,000 lb of them are running at the Samsonite and TUMI site today.
Proof, not promises
1.267 MWManufacturing & Warehousing · Vidalia, Georgia
The largest single installation OneWorld Solar has built: 1.267 MW of rooftop solar over a working distribution center, paired with 55,000 lb of BatteryCube® storage using CATL cells.
1 MW+Car Dealerships · Baxley and Vidalia, Georgia
More than 1 MW of rooftop solar across the Woody Folsom Chevrolet, Ford and Chrysler Dodge dealerships in Georgia — three roofs run as a single engineering and construction program.
800 kW
Rooftop solar
Hotels & Resorts · St. Maarten
The largest hospitality system OneWorld Solar has built: 800 kW of rooftop solar on an operating beachfront resort in St. Maarten, engineered for island grid economics and Caribbean wind loads.
Who we build for
Over 4.8 MW installed on U.S. poultry houses
Broiler and breeder houses have long metal roofs and a daytime fan load that lines up almost perfectly with the sun. We have installed over 4.8 MW on U.S. poultry farms, including a 450 kW 14-house broiler system.
1 MW+ installed across the Woody Folsom Automotive Group
Dealerships burn power all day for showroom HVAC, lighting and service bays, then all night for lot lighting. We have built more than 1 MW across Woody Folsom Chevrolet, Ford and Chrysler Dodge.
800 kW at the Westin Dawn Beach Resort & Spa, St. Maarten
Hotels run 24/7 and guest comfort is not negotiable. We built 800 kW at the Westin Dawn Beach Resort & Spa in St. Maarten and work across Florida, Georgia and the Caribbean.
1.267 MW plus 55,000 lb of battery storage for Samsonite/TUMI
A distribution center roof is usually the largest unused asset a manufacturer owns. We built 1.267 MW of rooftop solar and 55,000 lb of BatteryCube storage for Samsonite and TUMI in Vidalia, Georgia.
Three federal programs do most of the work on a commercial project. They stack, but the order matters, the terms change, and a credit is worth nothing to a business without tax liability. We prepare the documentation; your accountant makes the call.
Client results
“The working system is producing more power than expected, with nearly no maintenance issues. The monthly power bill savings of $1,800.00 per month is nice also.”
“In years past we have seen our electric bills run over $2,000.00 in the summer months. This past month we received a big flock of birds and our electric bill was only $750.00. Solar works. We received our USDA Grant, 30% tax credit and section 179 depreciation.”
“Your performance throughout the project was professional and you treated the owner, architect, and contractors with utmost respect.”
Insights

Micro-grids
Nobody can quote a microgrid from a phone call, and anyone who does is quoting something else. Here are the four things that set the number, in the order they move it.
4 min read

Micro-grids
Three different machines get sold against the same sentence — keep my site running. They fail differently, they cost differently, and only one of them earns anything on the days the grid behaves.
4 min read

Incentives
Two different technologies get called solar, they solve different problems, and picking the wrong one is an expensive way to find out. What solar thermal is good at, what photovoltaics is good at, and how REAP treats them.
4 min read
Latest news

Carolinas
On September 14 North Carolina's Attorney General asked the Utilities Commission to create a dedicated rate class for Duke Energy's data center customers, publish Duke's template contracts, move load forecasts to every 90 days and pause new gas plants until the forecasts are re-read. Duke says 80% of its new demand comes from data centers and large users.
4 min read

Solar Technology
On September 11 the Commerce Department made its solar duties on India, Indonesia and Laos final: dumping margins of 123.04%, 94.36% and 65.43%, with subsidy rates on top that take combined duties past 200% for every origin. The ITC votes October 14. What that does to a commercial quote this fall, and how to fix the supply before then.
3 min read

Utilities & Rates
An August 2026 catalog from the Edison Electric Institute lists the large load tariffs now in force across the Southeast: FPL's 50 MW contract schedules effective January 1, 2026, Georgia Power's minimum billing and longer terms for 100 MW customers, and Duke Energy Florida's pending filing. They are written for data centers. Here is what they change for everyone else.
4 min read
Common questions
Commercial work turns on three things residential rarely touches: three-phase power, demand charges, and a formal utility interconnection study. A commercial project needs stamped engineering, an interconnection application and switchgear coordination before anyone climbs on a roof. OneWorld Solar works only on commercial and agricultural systems, typically from 100 kW to just over 1 MW.
We are headquartered at 609 Church Street in Vidalia, Georgia and build across Georgia, Florida, South Carolina and North Carolina, plus the Caribbean, including St. Maarten and the U.S. Virgin Islands. Our VP of Engineering is a Professional Engineer licensed in South Carolina, North Carolina, Florida, Georgia, Virginia and Texas.
Since 2001, which makes it the oldest solar company in the Southeast. Doug Baird acquired the company in October 2017 and rebuilt it around large commercial and agricultural customers. Revenue has grown from zero at acquisition to $7.8 million in 2024, across more than 300 customers and over 7.8 MW installed.
Send us twelve consecutive months of utility bills. Not just the totals, the full bills, because the rate schedule, the demand charges and any power factor penalty are all on them and none of those show up in a monthly figure. From there we walk the site and come back with a system size, an installed cost, applicable incentives and a payback range at no charge.
Send us twelve months of utility bills and we will come back with a system size, a cost, the incentives you qualify for and a payback range — at no charge.